Sinks, showers and loos from the top floor fill the garden, the linen cupboards on the top front landing have gone, as have some of the wall partitions and the hot water!
The builders are busily working up an appetite by running up and down the tall fire escape with numerous van loads of debris for the dump.
The girls came home for an action packed site visit with the builders, electricians, plumber, surveyor and the architect. Thanks to the bad weather at the end November they only managed a day trip from London and Switzerland!